< Page 8: Siding the House

18 October 2003 — Front Porch Pillars and Insulation

It's really starting to look like it will look when it's done now!

The roof is done, the porch is done — all that's missing on the exterior is the siding around the front door, some of the siding in back, and the deck.

They've started insultating the house, too. Here's the "Great Room"...

Here's the dining area and kitchen...

And here (left to right) are the kitchen, the door to the garage, the doorway to the den and the stairway to the basement.

The furnace is now in the basement.

And we have windows and insulation in the look-out section.

Because it's built into the roof over the garage, all the walls and ceilings are insulated in the Frog.

< Page 8: Siding the House