Prva Design Group
Prva Design Group is currently working on a proof-of-concept Phase 1 Grant from the Department of Defense. The DOD has developed new technologies which interact to create a large scale mine detection system for battlefield deployment.
Using a previously developed aerial system, mine "hot-spots" are detected and divided into 20 foot by 20 foot square sections. After detection of probable mine locations, a ground detector must verify an active mine, or deny its location. Using the combination of these two systems, 20 foot wide "roadways" can be cleared through a minefield.
Design Milestones
- Sept 14 Team preliminary concept selection due
- Sept 21 Individual engineering trade study proposal due
- Oct 5 Individual engineering trade study due
- Oct 12 Flowchart of control system completed
- Oct 14 Selection of suppliers and parts completed and ordered to ensure availability
- Oct 26 Final CAD drawings finished to allow for manufacture of parts
- Nov 4 Sections of design proposal due for compilation
- Nov 11 Concept design proposal (first draft) due
- Nov 16 Demonstration of electronics, sensors and control logic
- Nov 18 Layout of all mechanical components
- Nov 23 Revised concept design proposal sections due for compilation
- Nov 30 In-house demonstration
- Dec 2 Final Concept Design Proposal due
- Dec 2 Engineering Notebook due
- Dec 2 Rehearsal for Critical Design Review
- Dec 7 Critical Design Review and product demonstration