Northern Peatlands Soil Warming Project Gallery 1


Peat transfer - Heavy equipment used to extract the frozen monoliths to build mesocosms. Click on picture for larger image (160K).

Plot transfer onto trailer - Hydraulic clamshell placing a bog monolith onto a trailer for transport to the mesocosm facility. In the background is shown the source bog site. Click on picture for larger image (176K).

Winter dig - Building the mesocosm facility in Nov. 1993. The insulated plastic tanks have plywood over them as the trench is being backfilled. In the lower right is a sump tank used to control water-levels. Click on picture for larger image (120K).

Placing peat into plot - Forklift placing bog monolith into mesocosm tank, shown by white lip on the ground. Click on picture for larger image (99K).

More photos