Quick Links
Project Nugget pdf
TTS xls
PDRs
Photos
Videos
|
Documentation
| Submitted to Management
|
| Jan. 22
|
Preliminary Design Requirements
pdf
|
|
Jan. 24
|
Individual Concept Memos
|
|
Feb. 12
|
Group Concept Selection Memo pdf
|
|
Feb. 28
|
Trade Studies
|
|
Mar. 18
|
Prototype Performance Requirements pdf
|
|
Apr. 8
|
Draft Design Documentation
Project Nugget pdf
Executive Summary pdf
Operation and User Interface pdf
Bill of Materials
Other supporting technical information pdf
|
Apr. 22
|
Concept Design Review ppt
The final presentation for the design process, the Concept Design Review (CDR) was given on Tuesday, April 22 and Thursday, April 24, to professors
and an industry review panel. Emphasis was placed on what was learned from the prototype and what new developments would be the focus of
further analysis.
|
| Supplemental
|
|
Apr. 16
|
Testing the prototype
|
|