|
DOCUMENTATION
Complete list of project documentation, including abstract,
executive summary,
system operation, trade studies, PDRs,
CDR, task tracking summaries, and project budget.
Abstract
Critical Concept Design Review
Executive Summary
System Operation
Engineering Trade Studies
STUDY and EXPLANATION |
WHO |
PDF |
MS Word |
| Gear Optimization: An analysis of the appropriate gear ratio necessary to maximize power
transfer from the human pedal input to the generator shaft. |
Eric |
|
|
Condensing Unit Study: An analysis of the thermal effects of different media surrounding the
condensing unit.
|
Nicole |
|
|
| Heating Element Dimension Optimization: A feasibility study to determine whether or not a polymer
heat source could be optimized and manufactured in-house. |
Tim |
|
N/A |
| Pressure Reduction Analysis: This study investigated the feasibility of reducing pressure within the
water boiling
chamber to assist the boiling process. |
Mike |
|
|
Preliminary Design Reviews
DATE |
PRESENTER |
PDF |
MS PowerPoint |
| September 7, 2006 |
Eric |
PDF |
|
| September 14, 2006 |
Tim |
PDF |
|
| Septemberr 19, 2006 |
Mike - Concept Review |
PDF |
N/A |
| September 28, 2006 |
Group |
PDF |
|
| October 3, 2006 |
Nicole |
PDF |
|
| October 12, 2006 |
Eric |
PDF |
|
| October 26, 2006 |
Tim |
PDF |
|
| November 2, 2006 |
Mike |
PDF |
|
| November 9, 2006 |
Nicole |
PDF |
|
| November 16, 2006 |
Group |
PDF |
|
Task Tracking Summaries
WEEK (Start Date) |
PDF |
Complete MS Excel sheet |
1 (8/22) |
|
|
2 (8/29) |
|
3 (9/05) |
|
4 (9/12) |
|
5 (9/19) |
|
6 (9/26) |
|
7 (10/03) |
|
8 (10/10) |
|
FALL BRREAK |
N/A |
9 (10/17) |
|
10 (10/24) |
|
11 (10/31) |
|
12 (11/07) |
|
13 (11/14) |
|
| |
|
Project Budget
|