Fall Break Trip 10/20/2003: Benicia-Martinez Bridge

(click on thumbnail for full resolution image)



100_0065.JPG
1.60 MB

On-site mock up of cast-in-place box girder

section.


100_0066.JPG
899.29 KB

On-site mock up of cast-in-place box girder

section.


100_0067.JPG
1.65 MB

On-site mock up of cast-in-place box girder

section.


100_0068.JPG
1.66 MB

On-site mock up of cast-in-place box girder

section.


100_0069.JPG
1.04 MB

Rebar forming box girder wall.


100_0070.JPG
1.55 MB

Bridge deck rebar being placed.


100_0071.JPG
910.34 KB

View on topside of bridge construction.


100_0072.JPG
689.60 KB

Inside cast box girder.


100_0073.JPG
808.52 KB

Inside cast box girder,

looking toward areas still being constructed.


100_0074.JPG
791.93 KB

Inside cast box girder.


100_0075.JPG
731.55 KB

Post-tensioning ducts.


100_0076.JPG
539.87 KB

Post-tensioning ducts.


100_0077.JPG
1.11 MB

Rebar forming walls of box girder.


100_0078.JPG
874.33 KB

Rebar forming walls of box girder.


100_0079.JPG
1.24 MB

Rebar forming walls of box girder.

100_0080.JPG
100_0080.JPG
1.25 MB

Students on walk through of construction site.


100_0081.JPG
1.91 MB

Bridge deck rebar.

100_0082.JPG
100_0082.JPG
930.37 KB

View of pier on approach before water crossing.

100_0083.JPG
100_0083.JPG
836.25 KB

On-site mixing plant.

100_0084.JPG
100_0084.JPG
945.17 KB

Bridge pier being cast.

100_0085.JPG
100_0085.JPG
747.88 KB

False work supporting bridge as it sets.

100_0086.JPG
100_0086.JPG
844.27 KB

False work supporting bridge as it sets.

100_0087.JPG
100_0087.JPG
716.58 KB

Students in front of one of many on-site cranes.

100_0088.JPG
100_0088.JPG
990.20 KB

Zoom of one of many on-site cranes.

100_0089.JPG
100_0089.JPG
765.52 KB

Casting of piers.

100_0090.JPG
100_0090.JPG
772.12 KB

Pile sections on barge awaiting assembly.

100_0091.JPG
100_0091.JPG
917.71 KB

Casting of piers.

100_0092.JPG
100_0092.JPG
960.90 KB

Pile driving site.

100_0093.JPG
100_0093.JPG
907.72 KB

Pile driving site.

100_0094.JPG
100_0094.JPG
539.03 KB

Catamaran crane for lifting massive segments between

two barges.

100_0095.JPG
100_0095.JPG
843.95 KB

View down pile: white tubes link to probes to check

integrity of pile.

100_0096.JPG
100_0096.JPG
947.14 KB

View down pile: white tubes link to probes to check

integrity of pile.

100_0097.JPG
100_0097.JPG
511.63 KB

View down pile: white tubes link to probes to check

integrity of pile.

100_0098.JPG
100_0098.JPG
792.61 KB

View down pile: white tubes link to probes to check

integrity of pile - ribs help to increase strength of pile.

100_0099.JPG
100_0099.JPG
724.43 KB

Pile section.

100_0100.JPG
100_0100.JPG
800.78 KB

Line of submerged piles.

100_0101.JPG
100_0101.JPG
1.22 MB

Excavation bit.

100_0102.JPG
100_0102.JPG
863.31 KB

Partially driven pile.

100_0103.JPG
100_0103.JPG
1.08 MB

Deformed pile resulting from complex

geotechnical profile.

100_0104.JPG
100_0104.JPG
683.75 KB

Lightweight aggregate from North Carolina

being used on bridge.

100_0105.JPG
100_0105.JPG
809.30 KB

Students walking along false work supporting bridge as concrete sets.

100_0106.JPG
100_0106.JPG
874.43 KB

False work supporting bridge as concrete sets.

100_0107.JPG
100_0107.JPG
878.33 KB

False work supporting bridge as concrete sets.

100_0108.JPG
100_0108.JPG
808.20 KB

False work supporting bridge as concrete sets.

100_0109.JPG
100_0109.JPG
1.02 MB

False work supporting bridge as concrete sets.

100_0110.JPG
100_0110.JPG
863.33 KB

False work supporting bridge as concrete sets.

100_0111.JPG
100_0111.JPG
863.77 KB

On-site mock up of cast-in-place box girder

section.

100_0112.JPG
100_0112.JPG
777.94 KB

Students heading back to site office after

"long day on the job."