| NDSP
Home | About
Us |
Crime Bulletin |
Crime Prevention |
Crime Blotter |
Silent Watch |
|
Clery Act |
RAD Classes |
Parking & Traffic |
Lost & Found |
Department Directory | Homeland
Security |
| Mail
Handling Safety |
On-Line Forms |
Student Affairs |
Campus Map |
Local Information |
Sports Information |
|
Resources for Victims of Rape & Sexual Assault | Transportation
for Injured Students |
| Severe Weather Information
| ND Home
|
Construction
Information
Information
from the University Architect's Office:
Road
Closing...
Holy
Cross Drive from Main Gate to Duncan Hall dock to close July 28 to
August 1, 2008 for Utility Construction.
Click
here to see a map of the area.
The
following parking lots will be closed for resurfacing...
1)
The D2 North and Middle Lots will be closed so resurfacing can happen
from July 21 to July 29, 2008. Please park in the D2 South Lot during
this time.
2) The B16 Lot
will be closed for resurfacing from July 28 to August 1, 2008. Please
park in D2 North lot during this time.
3) The
D2 South Lot will be closed for resurfacing from August 4 to August
11, 2008. Please park in D2 North, Middle lots during this time.
4)
The A11 Lot will be closed for resurfacing from August 7 to 13, 2008.
Please use the D6 Lot during this time.
5) The
B2 Library Lot will be closed for resurfacing from July 30 to August
7, 2008. Please use the C1 Lot for parking during this time.
Click
here to see a map of the lots being closed.
The
following parking lots and roadways will undergo crack sealing...
1)
The D6 North lot will be crack sealed from July 28 to August 2, 2008.
The lot will not be closed all at once. It will be coned off by contractors
by sections; please do not park in those areas until completed.
2) Lyons lot,
Morrissey lot and the connecting roadway, will be crack sealed from
July 28 to August 2, 2008. Alternative parking would be D6 Lot.
3) The northeast
corner of Library Lot will be closed for crack sealing from July 28
to August 2, 2008. Alternate parking would be C1 Lot.
4) The southeast
corner of Library Lot will be closed for crack sealing from August
4 to 9, 2008. Alternate parking would be C1 Lot.
5) The north/south
roadway just west of Ave Maria Press will be crack sealed from August
6 to 9, 2008.
|